Assembly work
EXPERIENCE: FOREIGN EQUIPMENT ERECTION (1979 - 2007)
as of 10.01.2008
|
|||
Manufacturer |
Type of the equipment |
Works with equipment |
Customer |
|
|||
ABB, |
Synchronous motor 4,2 МВА |
Mounting, electric-mounting of main drive of rolling mill "Quarto 2840" |
"Kamensk-Uralsky metallurgy plant", JSC |
|
|||
ARI MAKINA SANAYI, (Turkey) |
Production |
Mounting of electric-bridge cranes with capacity 2х12,5, 2х8 |
"Abinsky metallurgy plant", JSC |
|
|||
Amada, |
Processing |
Mounting, electric-mounting of lazer cutting machine |
"Ural plant of railway machine-building" |
Production | Mounting of bending machine | "Ural plant of railway machine-building" | |
|
|||
Atlas Copco, |
Compressor |
Repair, starting-up and adjustment works of compressor |
"Chelyabinsk zinc plant" |
|
|||
BRONX, |
Production |
Mounting of hydraulic press |
"Sinara pipe plant", JSC |
|
|||
DEVY LOEWI, |
Production |
Mounting/Dismantling of forging press complex |
"Uralmashzavod", JSC |
|
|||
ELIND, |
Heating |
Mounting, adjustment of the installation of induction heating with three cooling circuits of inductor, aimed to heat pipes before antirust covering |
"Volzsky pipe plant", JSC |
|
|||
ESAB, |
Welding |
Mounting of the welding device for the welding technological seam in the production of electric-welded longitudinal pipes of large diameter |
"Chelyabinsk tube-rolling plant", JSC |
|
|||
Gutman, |
Production |
Mounting of the line painting |
"Uralmashzavod", JSC |
|
|||
"Hydraulik", (Germany) |
Production |
Overhaul of the forging presses in 1995 and 2002 |
"Uralmashzavod", JSC |
|
|||
Hoesсh, |
Production |
Mounting of lathes |
"Uralmashzavod", JSC |
|
Metallurgical |
Mounting of rolling machines for the production of the electric-welded square-section tubes |
"Pervouralsk plant for pipe steel structures" |
|
|||
Hercules, |
Processing |
Repairing, starting-up and adjustment works of grinding machine |
"Uralmashzavod", JSC |
|
|||
Industrial System, |
Production |
Mounting, adjustment of the installation for Epoxy covering of the steel pepe surface by electrostatic sprayers |
"Volzsky pipe plant" JSC |
|
|||
ITWH, |
Production Transporting |
Mounting, adjustment of the installation for longwise and transversal movement of the pipe at the processing line of the pipe electric-welding machine TESA 1020-1220 with hydraulic and electric drive |
"Chelyabinsk tube-rolling plant", JSC |
|
|||
LOI, OFU, |
Production Heat-treating |
Mounting, adjustment of the equipment for heat treatment of oil pipes, including Gas-heating furnace with walking beams (hardening), high speed water cooling unit (spreader), gas-heating furnace with walking beams (tempering), devices (systems) for longwise and transversal movement of pipes at the processing line with hydraulic and electric drive |
"Volzsky pipe plant" JSC |
|
|||
MANTA, |
Production |
Mounting, adjustment of the shot-blasting machine equipped with a system of purification of waste gas and shot regeneration for preliminary surface preparation before antirust covering. |
"Volzsky pipe plant" JSC |
Production, transporting |
Mounting, adjustment of the installation for longwise movement of the pipe at the processing antirust covering line for pies Æ114-1020mm by electric drive |
"Volzsky pipe plant" JSC | |
|
|||
Mannesmann Rethrot, (Germany) |
Production, transporting |
Mounting, adjustment of the installation for transversal movement of the pipe at the processing antirust covering line for pies d114-1020mm by hydraulic drive |
"Volzsky pipe plant" JSC
|
|
|||
MESSER |
Production |
Installation of plasma cutting |
"Ural plant of railway machine-building", V. Pishma |
|
|||
Marcegalia S.p.A |
Production |
Assembly lines for production of pipes for refrigerators |
"PNTZ", JSC |
|
|||
NAKATA, «MITSUBISHI», |
Welding pipe-rolling |
Assembly and starting-up and adjustment works of electric welding mill FFX25 |
"Pervouralsky factory steel pipe construction" - OJSC "Uraltrubprom" |
|
|||
OTTO JUNKER GMBH, |
Heat-treating |
Mounting of bright annealing furnace |
"Kamensk-Uralsky metallurgy plant", JSC |
Heat-treating | Mounting of air-hardening machine |
"Kamensk-Uralsky metallurgy plant", JSC |
|
Heat-treating |
Mounting of homogenization furnace |
"Kamensk-Uralsky metallurgy plant", JSC |
|
|
|||
OSN, |
Production |
Copper rolling line: mounting of mechanical and electrical part of technological equipment |
"Kamensk-Uralsky non-ferrous metal - processing plant" |
Brass rolling line: draw-line №1/4,100 DX, draw-line 2/10,100 DX |
"Kamensk-Uralsky non-ferrous metal - processing plant" |
||
|
|||
"Reinstahl Wagner" (Germany)
|
Production |
KFR Wf 400 ring-expanding machine: dismantle, repair, assembly, commissioning |
"Volzsky pipe plant" JSC
|
|
|||
Siemens, |
Production | Mounting, adjustment of the extruder for adhesive covering for the steel pipe surface, production capacity 220 kg per hour | "Volzsky pipe plant" JSC |
Production | Mounting, adjustment of extruder for PE covering for the steel pipe surface, production capacity 1500 kg per hour | "Volzsky pipe plant" JSC | |
Stamping |
Electric-mounting of the lines of the hydraulic presses |
"Franke-Ural" LLC |
|
|
|||
SMS Meer, |
Production | Mounting, adjustment of exponder (stretching machine). | "Chelyabinsk tube-rolling plant", JSC |
Production | Mounting of production line of the finishing of tubing string, including: ultrasonic check device, 2 machines for thread-cutting at the ends of pipes, 2 machines for muff-screwing at the ends of pipes, hydraulic test press for pipes, marking machine, rustproof painting device, pipe packaging machine, devices (systems) for longwise and transversal movement of pipe at the processing line with hydraulic and electric drive. | "Sinara pipe plant", JSC | |
Processing | Assembly and starting-up and adjustment works of the horizontal metal processing machine | "Ural plant of railway machine-building" JSC | |
Production | Electric-mounting of upsetting press | "TMK", JSC | |
Production |
Mounting, adjustment of the long-wise stretching machine |
"Chkalovsky" LLC - "SUAL" JSC |
|
|
|||
Stein Industriallagen, (Germany) |
Transport system |
Mounting of stein (supply of coal powder in a ladle furnace |
Volgogradsky Metallurgy Plant "Krasny Oktiabr" |
|
|||
Shcmitz, Skoda, Sket, Krupp etc. (Germany, Czech Republic, Japan, Italy, etc.) |
Production Pressing |
Dismantle and installation of the hydraulic press PVE 100 S1M, rolling mill Shcmitz, Scoda, press Rute 068-00, termorihtovochnoy Japanese furnace FN 20-01 tn, knitting machine STOLL, Italian hydraulic press 800t, etc in the relocation of the plant |
"Ekaterinburg plant" |
|
|||
Shneider |
Tube-rolling |
Electric- mounting of the pipe-welding line |
"Chelyabinsk tube-rolling plant", JSC
|
|
|||
А&Р "Tehnologiya", |
Transport system |
Mounting of wire feeding (feeding of the copper wire in the ladle furnace) |
Volgogradsky Metallurgy Plant "Krasny Oktiabr" |
|
|||
Voest Alpine, (Austria) |
Metallurgical |
Mounting of the line of the longwise cutting |
"Pervouralsk plant for pipe steel structures"- "Uraltrubprom", JSC |
|
|||
Uhrhan-Schwil, (Germany) |
Welding |
Mounting of the welding device for internal and external welding seam in the production of electric-welded longitudinal pipes of large diameter |
"Chelyabinsk tube-rolling plant", JSC
|
|
|||
UNION, |
Production |
Mounting of the center manufacturing |
"Ural plant of railway machine-building" JSC
|
|
|||
Walmet, |
Processing |
Mounting of the equipment for the wood chipboard produce |
Verhnaya Sinyachiha veneer mill |
|
|||
Waldrich Sigen, (Germany) |
Processing |
Mounting of the grinding machine |
"Uralmashzavod", JSC |
|
|||
WEBER/DUCK |
Production |
Mounting of the dry brushing system |
"Kamensk-Uralsky metallurgy plant" JSC |
|