CJSC "Managing company of building holding" (CJSC "UKSH")

Lenin avenue, 24\8, off. 620
Yekaterinburg, Russia, 620014

tel (fax): +7 (343) 371-27-00

info@uksh.ru
Home page -> Our projects -> Assembly work

Assembly work

 EXPERIENCE: FOREIGN EQUIPMENT ERECTION (1979 - 2007) 
as of 10.01.2008


Manufacturer

Type of the equipment

Works with equipment

Customer


 ABB,
(Sweden)

Synchronous motor 4,2 МВА

Mounting, electric-mounting of main drive of rolling mill "Quarto 2840"

"Kamensk-Uralsky metallurgy plant", JSC


ARI MAKINA SANAYI,  (Turkey)

Production

Mounting of electric-bridge cranes with  capacity 2х12,5, 2х8

"Abinsky metallurgy plant", JSC


Amada,
(Japan)

Processing

Mounting, electric-mounting of lazer cutting machine

"Ural plant of railway machine-building"

Production Mounting of bending machine "Ural plant of railway machine-building"

Atlas Copco,  
(Italy)

Compressor

Repair, starting-up and adjustment works of compressor

"Chelyabinsk zinc plant"


BRONX,
(США)

Production

Mounting of hydraulic press

"Sinara pipe plant", JSC


DEVY LOEWI,
(Great Britain)

Production

Mounting/Dismantling of forging press complex

"Uralmashzavod", JSC


ELIND,
(Great Britain)

Heating

Mounting, adjustment of the installation of induction heating with three cooling circuits of inductor, aimed to heat pipes before antirust covering

"Volzsky pipe plant", JSC


ESAB,
(Sweden)

Welding

Mounting of the welding device for the welding technological seam in the production of electric-welded longitudinal pipes of large diameter

"Chelyabinsk tube-rolling plant", JSC


Gutman,
(Germany)

Production

Mounting of the line painting

"Uralmashzavod", JSC


"Hydraulik", (Germany)

Production

Overhaul of the forging presses in 1995 and 2002

"Uralmashzavod", JSC


Hoesсh,
(Germany)

Production

Mounting of lathes

"Uralmashzavod", JSC

 

Metallurgical

Mounting of rolling machines for the production of the electric-welded square-section tubes

"Pervouralsk plant for pipe steel structures"


Hercules,
(Germany)

Processing

Repairing, starting-up and adjustment works of grinding machine

"Uralmashzavod", JSC


Industrial System,
(Great Britain)

Production

Mounting, adjustment of the installation for Epoxy covering of the steel pepe surface by electrostatic sprayers

"Volzsky pipe plant" JSC


ITWH,
(Germany)

Production

Transporting

Mounting, adjustment of the installation for longwise and transversal movement of the pipe at the processing line of the pipe electric-welding machine TESA 1020-1220 with hydraulic and electric drive

"Chelyabinsk tube-rolling plant", JSC


LOI, OFU,
 (Germany)

Production

Heat-treating

Mounting, adjustment of the equipment for heat treatment of oil pipes, including Gas-heating furnace with walking beams (hardening), high speed water cooling unit (spreader), gas-heating furnace with walking beams (tempering), devices (systems) for longwise and transversal movement of pipes at the processing line with hydraulic and electric drive

"Volzsky pipe plant" JSC


MANTA,
(Italy)

Production

Mounting, adjustment of the shot-blasting machine equipped with a system of  purification of waste gas and shot regeneration for preliminary surface preparation before antirust covering.

"Volzsky pipe plant" JSC

Production, transporting

Mounting, adjustment of the installation for longwise movement of the pipe at the processing antirust covering line for pies Æ114-1020mm by electric drive

"Volzsky pipe plant" JSC

Mannesmann Rethrot, (Germany)

Production, transporting

Mounting, adjustment of the installation for transversal movement of the pipe at the processing antirust covering line for pies  d114-1020mm by hydraulic drive

"Volzsky pipe plant" JSC

 


MESSER
(Germany)

Production

Installation of plasma cutting

"Ural plant of railway machine-building", V. Pishma


Marcegalia S.p.A

Production

Assembly lines for production of pipes for refrigerators

"PNTZ", JSC


NAKATA, «MITSUBISHI»,
(Japan)

Welding pipe-rolling

Assembly and starting-up and adjustment works of electric welding mill FFX25

"Pervouralsky factory steel pipe construction" - OJSC "Uraltrubprom"


OTTO JUNKER GMBH,
(Germany)

Heat-treating

Mounting of bright annealing furnace

"Kamensk-Uralsky metallurgy plant", JSC

Heat-treating Mounting of air-hardening machine

"Kamensk-Uralsky metallurgy plant", JSC

Heat-treating

Mounting of homogenization furnace

"Kamensk-Uralsky metallurgy plant", JSC


OSN,
(Italy)

Production

Copper rolling line: mounting of mechanical and electrical part of technological equipment

"Kamensk-Uralsky non-ferrous metal - processing plant"

Brass rolling line: draw-line №1/4,100 DX, draw-line 2/10,100 DX

"Kamensk-Uralsky non-ferrous metal - processing plant"


"Reinstahl Wagner"  (Germany)

 

Production

KFR Wf 400 ring-expanding machine: dismantle, repair, assembly, commissioning

"Volzsky pipe plant" JSC

 


Siemens,
(Germany)

Production Mounting, adjustment of the extruder for adhesive covering for the steel pipe surface, production capacity 220 kg per hour "Volzsky pipe plant" JSC
Production Mounting, adjustment of extruder for PE covering for the steel pipe surface, production capacity 1500 kg per hour "Volzsky pipe plant" JSC

Stamping

Electric-mounting of the lines of the hydraulic presses

"Franke-Ural" LLC


SMS Meer,
(Germany)

Production Mounting, adjustment of exponder (stretching machine). "Chelyabinsk tube-rolling plant", JSC
Production Mounting of production line of the finishing of tubing string, including: ultrasonic check device, 2 machines for thread-cutting at the ends of pipes, 2 machines for muff-screwing at the ends of pipes, hydraulic test press for pipes, marking machine, rustproof painting device, pipe packaging machine, devices (systems) for longwise and transversal movement of pipe at the processing line with hydraulic and electric drive. "Sinara pipe plant", JSC
Processing Assembly and starting-up and adjustment works of the horizontal metal processing machine "Ural plant of railway machine-building" JSC
Production Electric-mounting of upsetting press "TMK", JSC
Production

Mounting, adjustment of the long-wise stretching machine

"Chkalovsky" LLC - "SUAL" JSC


Stein Industriallagen,  (Germany)

Transport system

Mounting of  stein (supply of coal powder in a ladle furnace

Volgogradsky Metallurgy Plant "Krasny Oktiabr"


Shcmitz, Skoda, Sket, Krupp etc. (Germany, Czech Republic, Japan, Italy,  etc.)

Production

Pressing

Dismantle and installation of the hydraulic press PVE 100 S1M, rolling mill Shcmitz, Scoda, press Rute 068-00, termorihtovochnoy Japanese furnace FN 20-01 tn, knitting machine STOLL, Italian hydraulic press 800t, etc in the relocation of the plant

"Ekaterinburg plant"


Shneider
(Germany)

Tube-rolling

Electric- mounting of the pipe-welding line

"Chelyabinsk tube-rolling plant", JSC

 


А&Р "Tehnologiya", 
 (Czech Republic)

Transport system

Mounting of wire feeding (feeding of the copper wire in the ladle furnace)

Volgogradsky Metallurgy Plant "Krasny Oktiabr"


Voest Alpine, (Austria)

Metallurgical

Mounting of the line of the longwise cutting

"Pervouralsk plant for pipe steel structures"- "Uraltrubprom", JSC


Uhrhan-Schwil, (Germany)

Welding

Mounting of the welding device for internal and external welding seam in the production of electric-welded longitudinal pipes of large diameter

"Chelyabinsk tube-rolling plant", JSC

 


UNION,
(Germany)

Production

Mounting of the center manufacturing

"Ural plant of railway machine-building" JSC

 


Walmet,
(Finland)

Processing

Mounting of the equipment for the wood chipboard produce

Verhnaya Sinyachiha veneer mill


Waldrich Sigen, (Germany)

Processing

Mounting of the grinding machine

"Uralmashzavod", JSC


WEBER/DUCK

Production

Mounting of the dry brushing system

"Kamensk-Uralsky metallurgy plant" JSC


 