MACHINE-BUILDING
DESIGNING |
|||
|
|||
2005 - 2008 |
"Ural plant of railway machine-building", JSC |
General designer |
Designing of high - tech manufacturing of cargo DC locomotives 2ES4K |
|
|||
2005 - 2006 | "Volzhsky bearing plant", JSC |
General designer |
Designing for erection of racers' anneal. |
|
|||
2005 - 2006 | "Volzhsky bearing plant", JSC | General designer | Designing for erection of spheroidizing racers' anneal equipment. |
|
|||
2005 |
"VSMPO - AVISMA" JSC, V.Salda, Sverdlovsk region |
Designer |
Industrial treatment plant. Defluorination unit, technical re-equipment. Recycling water supply of pickling sector (shop #3), defluorination unit, technical re-equipment. |
|
|||
2001-2005 | "Pnevmostroimashina"JSC, Yekaterinburg |
Designer | Research and development, designing of equipment. |
|
|||
2004-2005 | "Pnevmostroimashina"JSC, Yekaterinburg |
General designer | Development of technical solutions for re-equipment of treatment facilities of industrial mills |
|
|||
CONSTRUCTION | |||
|
|||
2006 - to date |
"Ural plant of railway machine-building", JSC Pishma, |
General contractor |
Construction and installation works: performing of hi-tech manufacturing of cargo DC locomotives 2ES4K . |
|
|||
2006 -2007 | "Uralmash-SpetzStal" LLC,Ekaterinburg | Contractor | Repairing works on forging plant with down pressure 10000 tones; repairing of bridge crane. |
|
|||
2006 | "Uralmash-SpetzStal" LLC,Ekaterinburg | Contractor | Current repairs of press machinery. |
|
|||
2006 | "Volgograd plant of special machine - building" | Contractor |
Manufacture and erection of steel constructions of spools and drilling rig equipment. |
|
|||
2005 -2006 | "Tractor company "VGTZ" JSC, Volzsky, Volgograd region | General contractor | Overhaul of storm water sewage. |
|
|||
2005-2006 | "Volzhsky bearing plant" |
General contractor |
Complex of construction and installation works for commissioning of press-forging line of hot forming of racers ("WAGNER"). |
|
|||
2001 - 2005 | "Pnevmostroimashina"JSC, Yekaterinburg |
Contractor |
Manufacture of equipment, assembling and putting into operation for wastewater after treatment at the operating treatment plant. |
|
|||
2005 | "Uralmashzavod" JSC,Yekaterinburg | Contractor | Assembling of CCM leveling units. |
|
|||
2000-2005 | Novocherkassk motorized track gang, PChM-1, Novocherkassk railway station | Depo for repairing of track machines: mounting of framework of worked in premises, crane runways, ferro-concrete and "sandwich" wall panels. | |
|
|||
2004 - 2005 | "Volgogradsky drilling equipment plant" LLC,Volgograd | General contractor | Inspection and overhaul of crane runway |
|
|||
2003 | "Uralmashzavod" JSC,Ekaterinburg | General contractor | Modernization of working production, incl. machining and press facilities of foreign manufacture: «Hesh», «Voest Alpine», «Toshiba» etc.
Modernization of «Valdrich - Ziegen» roll-grinding machine. |
|
|||
2002 -2003 | "Uralmashzavod" JSC,Ekaterinburg | General contractor |
Construction of the treatment and grounding line of metal sheets and sections "Gutman" |
|
|||
2001 - 2002 | "Uralmashzavod" JSC,Ekaterinburg | General contractor for «Shub Machinery» USA | Dismantling, packing and dispatch of forging machine "DEVY LOEWI" (hydraulic press with 2500 ton-force effort, 2 manipulators of 30 ton-force effort, total weight 2500 tones)
Repairing works on forging press with down pressure 3000 tones. Assembling of arc steel furnace tank with hydraulic actuator changeover. Reconstruction of betatron chamber in workshop Nr 50. Assembling of infrared source "GOGAS" gas heat system in workshops Nr 50, 96, 30 |
|
|||
2002 | "Turbine Motor plant" JSC,Ekaterinburg | General contractor | Construction and assembling works of stand testing gas-turbine power units. |
|
|||
RELOCATION | |||
|
|||
2004 | "FRANKE - Ural" LLC,Ekaterinburg | General contractor | Putting into operation vertical hydraulic press SMG 1500. |
|
|||
2003 | "FRANKE - Ural" LLC,Ekaterinburg | General contractor | Dismantling and modernization of the line of cold kitchen sink stamping machine in Germany; delivery arrangement, custom clearance, assembling and putting into operation in Yekaterinburg.
Installation of water recycling for pressing facilities. |
|